Saturday, March 12, 2016

Gutters and Downspouts, Shower, Utility Room, Trash Run

Gutters and downspouts are going on the house now that the drain tile is in place. Looks pretty awesome!

Here's Paul working on the shower in the 4-way bathroom.

This is the utility room in the garage. The walls have insulation. Steve put shelves in there. There's room for the propane boiler for the radiant floor heat, the collection tank for the well, and a deep sink.

Here's Steve on the way to the dump with whatever trash they have collected since the last run.

No comments:

Post a Comment