My niece Lindsey got some great pictures today! Here's the camper garage with plywood on the roof. We asked the electric company forever ago to remove that dead end power pole. I think they are finally coming next week:
Looking down the front of the house from Mom's end. The front porch is 8 feet deep:
Head-on view:
Looking down the front of the house from my end.
This is one of the back patio areas and the pool (billiards) room. This patio is the only area that has the stamped concrete so far. It's the same company that did the other concrete work. They had some left in the truck when they poured the camper garage, so they went ahead and did this area. They put down a sealer and will do the stain in the spring, when they do the other stamped concrete areas.
Looking past that same patio area is the pool room, another patio area, then the 3-car side-load garage. There's a door on this side of the garage for putting a riding mower in there. I don't know if I'll need a shed. I hope not, the lot is already pretty full!
The 3-car side-load garage, then the breezeway between the garage and Mom's house where we can enter the back door:
No comments:
Post a Comment