Tuesday, December 22, 2015

And Then It Rained!

After the slab was poured, we got a lot of rain. Steve set up production in his shop to pre-fab all of the walls that contain doors and windows.


Steve and I both checked out the lot to see if there were any problem areas. Just a little ponding. No problems!